Eyot House

Hyde Housing

Client

Hyde Housing

Project

Eyot House

Duration

24 Weeks

Location

Bermondsey, London

CONTRACTOR

Engie (Equans)

Main challenge

This was the stripping and replacement of non-compliant cladding, insulation and sheathing board to an occupied housing block. The location is adjacent to railway lines which limits access. Removal of the sheathing board had to be done in a phased process to maintain weather tightness throughout.

PROJECT GOAL

To achieve cladding that was compliant with the newly introduced Building (Amendment) Regulation 2018 whilst maintaining occupation with the least disruption to residents.

KEY SERVICES

Strip of existing cladding, insulation and sheathing layer and removal to skips.

 