Eyot House
Hyde Housing
Client
Hyde Housing
Project
Eyot House
Duration
24 Weeks
Location
Bermondsey, London
CONTRACTOR
Engie (Equans)
Main challenge
This was the stripping and replacement of non-compliant cladding, insulation and sheathing board to an occupied housing block. The location is adjacent to railway lines which limits access. Removal of the sheathing board had to be done in a phased process to maintain weather tightness throughout.
PROJECT GOAL
To achieve cladding that was compliant with the newly introduced Building (Amendment) Regulation 2018 whilst maintaining occupation with the least disruption to residents.
KEY SERVICES
Strip of existing cladding, insulation and sheathing layer and removal to skips.